The prologue of the Iberian Peninsula blackout on 28th April 2025

L. Rouco, F.M. Echavarren, E. Lobato

Sustainable Energy, Grids and Networks Vol. 46, pp. 102295

Resumen:

A blackout occurred in the Iberian Peninsula electricity system at 12:33 on 28th April 2025, the first one in history caused by overvoltage, which refers to the cascading disconnection of renewable generation with fixed power factor control triggered by overvoltage generation protections. The blackout was not due to a single event, but rather a combination of multiple events and various phenomena. The root causes cannot be fully identified unless what happened in the days and even months preceding the event (the prologue) is recognized and well understood. Precisely, voltage instability phenomena occurred during the week preceding and the morning of the event. In this paper, the term “voltage instability phenomena” refers to uncontrolled rapid variations in network bus voltages. Such phenomena were preceded by an alarm as early as January 31, 2025. This paper shows that mere inspection of voltage evolution over time is insufficient to detect voltage instability and proposes novel metrics that can be implemented within control centers as an alarm to alert of voltage instability. The first one is based on the Rate of Change of Voltage (RoCoV). The second one is obtained by applying spectral analysis to the voltage signal.


Resumen divulgativo:

Este artículo describe la fase 0 del apagón de la península ibérica del 28 de abril de 2025, caracterizada por variaciones rápidas y descontroladas en las tensiones de los nudos de la red. La simple observación de la evolución temporal de la tensión resulta insuficiente, por lo que se proponen nuevas métricas para alertar sobre la inestabilidad de tensión.


Palabras Clave: Voltage stability; Voltage control; Rate-of-change of voltage; Spectral analysis


Índice de impacto JCR-JIF y cuartil WoS: 5,700 - Q1 (2025)

Referencia DOI: DOI icon https://doi.org/10.1016/j.segan.2026.102295

Publicado en papel: Junio 2026.

Publicado on-line: Mayo 2026.



Cita:
L. Rouco, F.M. Echavarren, E. Lobato, "The prologue of the Iberian Peninsula blackout on 28th April 2025", Sustainable Energy, Grids and Networks, Vol. 46, pp. 102295, Junio 2026. [Online: Mayo 2026] doi: 10.1016/j.segan.2026.102295

    Líneas de investigación:
  • Régimen permanente: Flujos de cargas, análisis de restricciones de operación, flujos de cargas óptimo, servicio complementario de control de tensiones, cortocircuitos, protecciones en redes de transporte y distribución, modelos térmicos de cables
  • Estabilidad: Estabilidad de gran perturbación, ajuste de protecciones de deslastre de cargas por frecuencia, control de la excitación, estabilidad de pequeña perturbación, ajuste de estabilizadores del sistema de potencia, identificación de modelos de reguladores
    Grupos de investigación:
  • Instituto de Investigación Tecnológica (IIT)
    ODS:
  • Objetivo 7: Energía asequible y no contaminante
  • Objetivo 9: Industria, innovación e infraestructuras

pdf Previsualizar
pdf Solicitar el artículo completo a los autores